PRICE REGULATION

Natural gas

Connection costs

The Agency adopts Methodology on setting costs of connection to natural gas transmission and distribution systems which defines the method of billing and more detailed criteria for certain types of connections:

System operators adopt a document on the amount of connection costs set in line with this methodologies, along with norms for billing connection costs and unit costs for setting a part of system costs incurred by the connection of a facility to the system.

A document on the level of costs of standard connections also includes the level of costs of the construction of a standard connection for each standard connection category, the level of costs of connection in case of simultaneous construction of the network and standard connection for each category, the level of variable costs and the cost of the part of the system which is regulated by the operator in line with the methodology.

Based on principles of publicity and non-discrimination, system operators provide access to documents which serve as the basis for the establishment of connection costs, i.e. the level of costs and how they are established.

If, based on the data that have been submitted, as well as the data which the Agency may require in line with the Law, the Agency considers that the system operator has not adopted the documents on the level of connection costs in line with this methodology, upon the Agency’s request, the system operator will submit a new document established fully in line with this methodology 30 days upon the written request of the Agency.

The level of connection costs for standard connections is set once a year, at the latest by November 30 for the following calendar year. It may be modified during the year in case consumer prices index increases by more than 10% according to publicly-announced data of the body competent for statistical issues for the period prior to the adoption of a decision on the establishment of connection costs for standard connections until the level of these costs are modified – the Agency is informed on this.

<< Back


RELATED LINKS
How prices are established
Methodologies for setting prices
Approval of prices and rationale
(Only in Serbian language)
Prices (Only in Serbian language)
Connection costs
Price statistics


Copyright © by Energy Agency of the Republic of Serbia