ENERGY MARKET

Frequently Asked Questions

  • Should customs duties be paid for import/export of electricity in/from the Republic of Serbia?
    This is an issue in the domain of the relevant customs authorities rather than the responsibility of AERS. Based on the Energy Community Treaty, ratified in 2006, the Republic of Serbia assumed the responsibility to abolish custom duties and limitations on import and export quantities of electricity and gas for countries the EC Treaty applies to
  • Do I have to pay for the transit of electricity through the transmission network of the Republic of Serbia? How can I book the transmission capacity on interconnected power lines in the Republic of Serbia?
    PE “Elektromreza” (EMS) as the transmission system operator and electricity market operator in Serbia is responsible for the allocation of rights to use the available cross-border transmission capacities on interconnected power lines within the Serbian power system. Preliminary rules for allocation of rights to use available cross-border transmission capacities on interconnections of the Republic of Serbia, based on the market principle as an explicit auction on a monthly basis, are available on the PE EMS website (www.ems.rs).
  • Under Article 10.1.3 of the “Rules on Cross-border Transmission Capacity Allocation of the public enterprise for electricity transmission and transmission system management „Elektromreza Srbije“ (PE EMS) for PE EMS control area borders for the period 01/01 – 31/01/2012”, curtailment might take place "due to the scheduled annual disconnections of the cross-border interconnection lines for regular maintenance, due to Force Majeure or other unplanned/unforeseen events in the electric power system." This notion of "unplanned/unforeseen events” is not defined in the rules and could cover a broader category of events for which curtailment might be possible, and there is a risk that it might go beyond the "emergency situations where the transmission system operator must act in an expeditious manner and re-dispatching or countertrading is not possible" which are in fact the only possibility for curtailment allowed by the Regulation 1228/2003 (Article 6(2)). Please clarify the notion of "unplanned/unforeseen or unscheduled events" (other than Force Majeure) in Articles 10.1.3, 10.1.7 and 10.2.3 of the Allocation Rules for 2012.
    The current wording of these Articles does not give any grounds or possibility for curtailiment outside of what Article 6(2) of Regulation 1228/2003 foresees as the only applicable reason ("emergency situations where the transmission system operator must act in an expeditious manner and redispatching or countertrading is not possible"). This clearly comes out of the stipulation of Article 10.3 of the Allocation Rules, which was introduced on the insisting of AERS. In the spirit of avoiding any doubt in this respect, albeit only lingual, we shall focus our efforts on reformulating the provisions of the abovementioned Articles in the Allocation Rules for 2013.
  • Article 10.1.8 of the “Rules on Cross-border Transmission Capacity Allocation of the public enterprise for electricity transmission and transmission system management „Elektromreza Srbije“ (PE EMS) for PE EMS control area borders for the period 01/01 – 31/01/2012” provides for a definition of Force Majeure by stipulating that "Force Majeure events and circumstances are those which could not be foreseen, prevented, avoided or eliminated by the measures undertaken to preserve safe and reliable operation of the electric power system, compliant with the Grid Code and which took place after the Allocation Procedure and in particular natural disasters, fires, flood, earthquakes, state of emergency and warlike operations as well as the measures of the state authorities and organizations of the transmission system operators." This definition of Force Majeure includes "measures of the state authorities and organizations of the transmission system operators", which would seem to constitute rather the reactions to an emergency situation than the emergency situation itself. Please specify which measures of the state authorities and organizations of the transmission system operators in Article 10.1.8 of the Allocation Rules for 2012 could be considered Force Majeure. Please clarify if only measures required as an expeditious reaction to emergency situations can trigger capacity curtailment.
    It is notorious that there are various nuances in comparative law (including that of EU Member States and their TSOs) regarding the definition of Force Majeure. Irrespective of this fact, and without opening an unnecessary academic debate on the issue, AERS shall construe the provisions of the Allocation Rules in such a manner that only measures required as an expeditious reaction to emergency situations can trigger capacity curtailment.



  • WHAT'S NEW
    22.8.2019 - AERS Council: Approval of Plan for Transfer of Metering Devices within Distribution System to Distribution System Operator “EPS Distribucija” d.o.o. ... >> Details
    15.8.2019 - Approval of EMS a.d. Rules on Publication of Key Market Data ... >> Details
    15.8.2019 - Certificate issued to GASTRANS d.o.o. as to Independent Natural Gas Transmission Operator ... >> Details
    16.7.2019 - Revoked Transmission System Operator Certificate of Yugorosgaz-Transport ... >> Details
    8.5.2019 - AERS Hosting Meeting on Gas in South and Southeastern Europe ... >> Details
    22.3.2019 - The Council of the Energy Agency of the Republic of Serbia adopted Decision on dismissal of certification application of the Limited Liability Company “Transportgas Srbija” ... >> Details
    8.3.2019 - Approval of GASTRANS Acts regarding Exemption of New Interconnector ... >> Details
    5.3.2019 - Exemption for New Natural Gas Interconnector Approved to GASTRANS ... >> Details
    13.2.2019 - Public Consultation: Republic of Serbia Transmission System Development Plan for 2019-2028 ... >> Details
    12.2.2019 - Approval of 2018-2027 EMS AD Transmission System Development Plan and 2018-2020 Investment Plan. ... >> Details
    25.1.2019 - Approval of Decision on Prices of Non-Standard Services of “EPS Distribucija” ... >> Details
    1.10.2018 - Exemption of New Natural Gas Interconnector Approved to GASTRANS ... >> Details
    29.9.2018 - Permanent Advisory Forum of the National Regulatory Authorities of the Balkan Countries Established ... >> Details
    24.9.2018 - Approval of YUGOROSGAZ-TRANSPORT Transmission System Development Plan ... >> Details
    24.9.2018 - AERS: Reports on Necessity of Price Regulation and of Supply of the Last Resort Adopted ... >> Details
    3.9.2018 - Decision on Rules for Capacity Allocation and Mechanisms for Transmission Capacity Operation of GASTRANS Company ... >> Details
    26.6.2018 - Public Consultation: YUGOROSGAZ – TRANSPORT D.O.O. Transmission System Development Plan for 2018-2027 ... >> Details
    12.6.2018 - Cooperation Agreement between Serbian and Bulgarian Regulator ... >> Details
    25.5.2018 - AERS adopted 2017 Annual Report ... >> Details
    18.5.2018 - AERS 2018 Financial Plan Adopted ... >> Details
    4.5.2018 - Ten Non-Binding Bids for Use of Future Gas Pipeline ... >> Details
    22.3.2018 - President and Members of the Energy Agency Council Elected ... >> Details
    8.3.2018 - GASTRANS: Expression of Interest Notice for Submission of Non-Binding Bids for Capacity Reservation ... >> Details
    9.2.2018 - The Council of the Agency Adopted Decision on Method and Deadlines for Market Test on the Interest in the Use of Future Infrastructure Facility of the Company “GASTRANS” ... >> Details
    2.2.2018 - GASTRANS Submitted Third Party Access Exemption Application to the Energy Agency ... >> Details
    23.1.2018 - Energy Community adopts first set of Third Energy Package Network Codes and Guidelines ... >> Details
    17.1.2018 - Assessment of Infringement of Competition Rules in the Natural Gas Market in the Republic of Serbia ... >> Details
    15.12.2017 - Approval of EMS JSC Transmission Network Code ... >> Details
    15.12.2017 - Approval of EMS JSC Plans ... >> Details
    14.12.2017 - Prices of System and Ancillary Services in Power System for 2018 Set ... >> Details
    8.12.2017 - Approval of Agreements on Cross-Border Capacity Allocation ... >> Details
    31.8.2017 - Approval of Decision on Price of Non-Standard Services of EMS JSC ... >> Details
    31.8.2017 - Approval of Decision on New Electricity Guaranteed Supply Prices ... >> Details
    20.7.2017 - AERS: Approval of Electricity Distribution Network Code ... >> Details
    20.6.2017 - АЕRS: Independent Transmission System Operator Certificate to Yugorosgaz-transport, LLC ... >> Details
    20.6.2017 - АЕRS: Approval of Metering Equipment Transfer on the Distribution System EPS Distribucija ... >> Details
    20.6.2017 - AERS: Approval of Yugorosgaz-Transport Transmission System Development Plan ... >> Details
    1.6.2017 - Reports on Necessity of Electricity Price Regulation Adopted ... >> Details